Product Details:
Place of Origin: Jiangsu, China
Brand Name: TPF
Certification: ISO9001 ,CE Certification
Model Number: BMTE
Payment & Shipping Terms:
Minimum Order Quantity: 20pcs
Price: negotiation
Packaging Details: Plywood cases
Delivery Time: 25-35 days after order
Payment Terms: 30% pay down ,70% pay before shipping
Supply Ability: 30000pcs/month
Product Name: | Eaton Motor | Mode: | Geroler Gear Set |
---|---|---|---|
Displacement: | 160CC -800CC | Material: | Cast Iron |
Color: | Blue, Grey Or Black | Net Weight: | 20-25KGS |
Shaft: | Many Type Shaft | FLOW: | Disc Distribution Flow |
Flange: | 4 Bolts Flange | ||
High Light: |
small hydraulic motor,gerotor hydraulic motor |
One type of LSHT motor,which can replace Danfoss OMT series ,M+S MT series ,Eaton 4000 series etc.
Feature | Code | Description |
---|---|---|
PRODUCT | M | MOTOR |
SERIES | 04 | 4000 SERIES |
DISPLACEMENT | 099 | 162.2 CM3/R [9.90 IN3/R] |
MOUNTING TYPE | AB | STANDARD, 4 BOLT; 101.60 [4.000] PILOT DIA 14.7 [.58] SLOTS ON 127.00 [5.000] DIA.BOLT CIRCLE. (SAE B) |
OUTPUT SHAFT | 01 | 31.75 [1.250] DIA. STRAIGHT WITH .375-16UNC-2B THREAD, 53.1 [2.09] MAX COUPLING LENGTH, 7.938 [.3125] SQ X 41.27 [1.625] STRAIGHT KEY |
PORTS | AB | 1.0625-12 UN-2B SAE O-RING PORTS - STAGGERED PORTS |
CASE FLOW OPTIONS | 02 | .4375-20 UNF-2B SAE O-RING PORT WITH CHECK VALVE |
LOW PRESSURE RELIEF | 0 | NONE |
PRESSURE/FLOW OPTION | 00 | NONE |
GEROLER OPTION | 0 | STANDARD |
SEAL OPTION | 0 | STANDARD |
ACCESSORIES | 00 | NONE |
SPECIAL FEATURES (HARDWARE) | 00 | NONE |
SPECIAL FEATURES (ASSEMBLY) | 00 | NONE |
PAINT/PACKAGING | 00 | NO PAINT, INDIVIDUAL BOX |
CUSTOMER IDENTIFICATION | 00 | NONE |
DESIGN CODE | F | SIXTH |
* Advanced manufacturing devices for the Geroler gear set,which use low pressure of
start-up, provide smooth and reliable operation and high efficiency.
* The output shaft adapts in tapered roller bearings that permit high axial and radial
forces.Can offer capacities of high pressure and high torque in the wide of applications.
* Advanced design in disc distrbution flow, which can automatically compensate in
operating with high volume efficiency and long life, provide smooth and reliable operation
OEM | yes |
Lead Time | 5-20 working days for less than 1500pcs |
Payment | L/C,T/T |
30% pay down ,70% pay before shipping | |
Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
Shipping | 1)By air or sea or combined transportation |
2)Express:TNT,FEDEX,UPS,DHL |
1. Guarantee for one year after shipping
2. During the guarantee period,
If the problem comes from quality .our company will supply the easy-damaged spare parts by free to solve this problem . We will supply drawing and video to tell you how to change
If the problem comes from raw material ,we will compensate for you
3. After expiration, our company supply seal kits for engines.
4.Any problems , Please do not hesitate to tell us, we will solve for you asap
Contact:Ms. zhu
Phone:86-15052963368
Tel:86-511-86575816
Email:infor@titanpowerfluid.com
Add:No280,Guyang Town ,Zhenjiang city,Jiangsu Province,P.R.China