• 102S+PVFD valve
  • 102S+PVFD valve
102S+PVFD valve 102S+PVFD valve

Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit

Product Details:

Place of Origin: Jiangsu, China

Brand Name: TPF

Certification: ISO9001 ,CE Certification

Model Number: 102S+PVFD valve

Payment & Shipping Terms:

Minimum Order Quantity: 20pcs

Price: negotiation

Packaging Details: Plywood cases

Delivery Time: 25-35 days after order

Payment Terms: 30% pay down ,70% pay before shipping

Supply Ability: 30000pcs/month

Detailed Product Description

Product Name: Hydraulic Steering Units Mode: Load Sensing
Displacement: 50cc-400cc Material: Cast Iron
Color: Blue, Grey Or Black Net Weight: 5.75-7.50kgs
Max.input Pressure: 16Mpa Mounting: Modulary Mounting
Max.cont.back .Pressure: 2.5Mpa Signal Code: Dynamic Signal
High Light:

Orbital Steering Unit

Power Steering Unit

 

102S-5+PVFD40/60/80 Priority valve hydraulix steering units which replace Danfoss OSPC LS+OLS valve

Specifications :

Parameters Model 102-5T-***-*,102S-5(T)(TE)(L)(E)-***-**-*
Displacement(mL/r) 50 63 80 100 125 160 200 250 280 315 400
Max.input speed(rpm) 100 75
Max.input pressure(Mpa) 16
Relief Valve Pressure Settings(Mpa) 06,07,08,10,12,14,15,16
Shockproof Valve Pressure Settings(Mpa) 12,13,14,16,18,20,21,22
Max.cont. back pressure(Mpa) 2.5
Weight(kg) 5.94 6 6.08 5.91 6.3 6.5 6.7 6.9 7.1 7.29 7.79
Dimension L(mm) 140 142 144 146 149 154 159 165 170 175 185

Parameters Model
PVFS(D)/PVLS(D)
Max.Input Flow (L/Min) 40,60,80
Control Pressure (Mpa) 0.45,0.7,1.05
Max.Pressure in Oil:P,EF(Mpa) 20
Max.Pressure in Oil:Ls,CF(Mpa) 16

Function code : Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit 1

Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit 2     Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit 3

Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit 4

Priority Hydraulic Load Sensing Valve , 50cc - 400cc Sauer Danfoss Steering Unit 5

 Packing and shipping

OEM yes
Lead Time 5-20 working days for less than 1500pcs
Payment L/C,T/T
30% advance payment,the balance paid before shipment
Packing Motor each have their own carton,the outer packing is a five-layer plywood boxes
Shipping 1)By air or sea or combined transportation
2)Express:TNT,FEDEX,UPS,DHL

Wechat QR code Close
the qr code